From: route@monster.com
Sent: Thursday, April 07, 2016 11:49 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Shahin Shafiq, PMP • Project Scheduler / Project Controller
Shahin Shafiq, PE, PMP Working Status: US Citizen I
would show any licensing associated with project management for example, PMP,
if I had any. Otherwise I would try to hide two PE states. Emphasizing PE
gives my resume more “engineering” flavor than scheduler flavor. Project Controller/ Scheduler Tell
them who you are in the beginning. Let them know that you are a
scheduler. 7721 NW
16 CT Fort
Lauderdale, FL-33024 Cell:
(561) 254-4403, Home: (954) 905-9557 E-mail: shahin.tamu@gmail.com OBJECTIVE: A
challenging position in the field of Project Controller/ Scheduler. SPECIAL QUALIFICATIONS: I have over eight years
of extensive and hands-on project experience in planning, scheduling, earn
value management (EVMS) per ANSI/EIA-748A standard, risk management,
negotiations and project management. I provided project scheduling, portfolio
management and coordination from inception to completion, ensuring work is
done in a timely manner and within budget. My key responsibilities have
included planning, scheduling, estimating, bid analysis, purchasing and
coordination of field supervisors. My experience covers a wide range of
assignments and project types including utilities, highway construction, high
rise buildings ranging from 8 to 50-stories, airport facilities and water
treatment facilities. I have outstanding proficiency in P6, MS-Project and Oracle's Primavera Portfolio Management. I planned and
developed the detail project plan via Pr5imavera 6, performed
responsibilities of developing, implementing and maintaining cost structures,
monitored report and forecast project costs by using cost management tools,
monitored the construction schedule against the actual construction on site
on a weekly basis and preparing project percentage complete report and
S-curves based on percentage/ cost prepared monthly and quarterly project
reports as well as program report by gathering data from engineering and
subcontractors handle the tasks of supporting project control leads and
project service managers on assigned projects I analyzed all technical aspects of
schedules and prepared schedules planning, design and construction; monitored
schedules and took appropriate actions to ensure that project is completed on
schedule and within approved cost limitations; provided ongoing interface
with contractors, construction managers, construction site personnel and
senior management on project issues; participated in the development and
issuance of project procedures and policies; resolved issues and problems
raised in field reports made by design and construction management staff;
worked with the architect/engineer of record regarding change orders, time
extension, performed interpretation of contract documents, shop drawing
submittals/approvals and other technical matters as required to ensure a
structurally sound, code compliant and aesthetic facility. I issued field
memoranda and directives to contractors to enforce contract
compliance. I used sound, independent judgment to make on-site change
order decisions. I negotiated with contractors and committed resources
on such change orders; review contractors' claims or disputed work and advise
senior management officials. I worked in a technical
capacity with the product in front end and in back end– this involved doing
P6 installation, Oracle database configuration, Oracle database connection
using ADO and made global settings that controlled how the product is used,
configured the product to provide particular types of metrics reporting. I
have hand-on experience to work in front-end and Oracle in back-end.
The front-end provided the capability to create & manage schedules,
project plans, etc – this is more of the end user side. The back-end
allows technical personnel to configure the product. I have Workflow creation
knowledge of Contract Management. I created CM APIs and Webservices,
Integrated of CM and P6. I worked on Oracle Primavera P6 Enterprise Project
Portfolio Management Suite (Release 8),Oracle Business Process Management
Suite, Oracle BI Publisher and the OBIEE Platform. Back End Experience I have excellent working
knowledge of developing and implementing project management systems and their
Integration with ERP or Legacy Systems, using standards based
technologies. I performed Oracle Primavera technical consulting,
developed add-on modules in Java to implement various Oracle Primavera custom
application extensions. I have expert knowledge of Oracle Primavera
data base schema and Data Tables. I am Involved in design, proto-type
development, implementation and managing Integration solutions for Oracle
Primavera solutions, also I performed Proof Of Concepts to help validate
proposed Oracle Primavera solutions. Develops and delivers presentations and
demonstrations as required to gain customer's acceptance of the Oracle
Primavera solutions for complex customer and/or integration requirements. I
have through understanding of API's and functionality around integrations
Able to lead /direct developers on Building code. Education
B.Sc.Eng, Civil Engineering M.Eng, Construction Management, Lamar University, Beaumont,
Texas, 2003 M.Sc in Computer Science, Texas A & M, Texas, 2002 B.
Sc. (Civil Eng.), BUET, Bangladesh, 1998 PROFESSIONAL
REGISTRATIONS: Licensed
Professional Engineer, State of Florida (FL PE # 65195) Licensed
Professional Engineer, State of Texas (TX PE # 96434) CERTIFICATION:
PMP-PMI: 1489731 MEMBERSHIPS: Project
management Institute (PMI) Computer
Skills
·
Primavera P6, V7 Project Management, ·
Primavera P3 Project Planner, ·
MS Project, MS Access, Oracle, ·
Java, SureTrak, Expedition, MS Excel, ·
MS Outlook, MS PowerPoint, ·
MS Publisher, MS Word, Arc Pad, ·
Timberline, CostLink, Schedule Analyzer Professional
Organizations: A.D.A.Engineering,
Inc., Miami, FL, March 2010 to Present Florida
Dept of Transportation (FDOT)D-6, Miami, FL, March 2009 to March 2010 American
Consulting Engineers, West Palm Beach, FL, Jan 2008 to Dec 2008. Kimley-Horn
and Associates, Inc., West Palm Beach, FL, April 2005 to Jan 2008. Keith
& Ballbe, Inc, Fort Lauderdale, FL, May 2003 to April 2005 Project Controls I am currently assigned to
Miami-Dade Water and Sewer Department’s (M-DWASD) South Miami Heights Water
Treatment Plant. My primary responsibility consists of the following: Reviewing Contractor’s Baseline schedule
submissions and providing narrative. Performing QA/QC on contractor schedule
submittals for conformance with contract. Reviewing
critical path, cost loading,
schedule content, use of relationships and lag, constraints and milestones Performing schedule impact analysis for
contractor change orders and conducting schedule negotiations for
contractor change orders. Performing Critical Path analysis and Earned Value
analysis using Primavera P6 and MS-Project, tracking and binge involved in
project issues as they relate to project schedules, Walking the field, check
the contractor’s weekly and monthly schedule progress and provide reports to
the project OAR and upper management Reading drawings, determining if work is
in or out of scope, and understanding terms and conditions of the contract to
determine compensability, as well as concurrent delays Anticipating schedule
impacts and advising Project Team concerning same Communicating with the
Contractor regarding all schedule/progress related matters and concerns in
the weekly status meetings and all other schedule related meetings Reviewing,
evaluating, and rejecting or approving contractor recovery schedules.
Preparing reports as needed and directed by Management Performing status
updates to Program Schedule/Master Schedule Performing Program Schedule QA/QC
review and updates Creating Ad hoc project schedules as requested Reviewing
and accepting Critical Path Method (CPM) project schedules submitted by the
Contractor, which include the baseline schedule and the subsequent schedule
updates. Preparing technical reports which make full
assessment of the schedule submittals and integrate CPM analysis and Earned
Value techniques to assure contractual parameters are met and measure cost
progress. In
this paragraph, I would put one or two sentences about risk analysis and risk
management. Reviewing
Schedule of Values (SOV) prepared by Contractor. Making
recommendations to project management. I
was previously assigned to Miami International Airport’s North Terminal
Development Consolidation Program (NTDCP) that encompassed the construction
of a mile-long terminal facility with a construction cost over $3 billions.
As part of the program scheduling team I participated in the management and
control of the Program Schedule in Primavera P6 Project Management. My
responsibilities included the following: Creating
and adding fragnets to both Impacted and Updated Master Schedules to reflect
monthly fully executed Work Orders and mitigate potential impacts to the
program. Activities in fragnets were coded, logically tied and resource
loaded. Updating
the physical progress (status) and cost progress (resources) of activities. Updating
activity resources for each individual trade in an effort to support the cost
team with the preparation of the Trade Contractors’ and Managing General
Contractor’s Applications for Payment. Preparation
of various scheduling reports and layouts such as impacted critical path,
updated critical path, sequence-to-milestones and payment applications for
the different trades. Participation
at meetings with the trade contractors on a weekly basis to validate the
physical progress of projects. Managing
and controlling the SWAT Master List, the Rejected Work Order List and the
Change Management Summary sheet on a weekly basis as support to the change
management team. Managing
and controlling approved Work Orders and Change Authorizations. Adding
SWAT letters, Task Directives, Work Orders and Change Authorizations to
Expedition. Preparation
of responses to the Owner and the Trade Contractors relative to rejections of
Proposed Work Orders. Researching
and developing of work breakdown structure (WBS) and the overall
effectiveness of the Primavera (P6) scheduling system as well as the WebPM
functionality. Planning
& Scheduling Prior
to the above assignment, as a Construction Project Scheduler, I worked on
various residential and commercial high rise buildings and multi-unit
projects. The schedules ranged from preliminary level (500+ activities) to
detailed level (2700+ activities). My duties included the following: Schedule
development, management and control using CPM-based Primavera P3 Project
Planner software. Performance
of bi-weekly or monthly progress updates, and creation of multiple schedule
layouts such as management summary, longest path, near critical, look-ahead
and individual trades. Performance
of periodic visits to the job site to validate physical progress. Application
of different delay analysis methodologies among which are Time Impact
Analysis (TIA) and forensic schedule analysis. Construction
Claim Management Concurrent
to my schedule responsibilities in the private sector, I served as
construction management consultant to the Miami-Dade school board’s outside
legal counsel and various private law firms. I provided numerous services as
follows:
Performed
claim analysis with the assistance of different construction management tools
in numerous delay claims, performance & payment bond claims and latent
defect claims. Coordinated,
conducted and documented the results of periodic site visits related to
construction or design deficiencies. Claim items included structural, water
intrusion, HVAC, plumbing and electrical deficiencies. Coordinated
and monitored the preparation of remediation and testing protocols by expert
consultants, remediation work by contractors and post-remediation testing by
expert consultants. Reviewed
and recommend scope of work and pricing in proposals submitted by remediation
contractors. Prepared
Order of Magnitude Estimates. Earned
value management and cost estimation I
have been responsible for cost estimating for various commercial and
educational facilities and have also contributed in several public work
projects, Preparation of different classes of estimates based on existing
level of project definition such as feasibility, conceptual, budgetary, bid
tender and bid check. Measured
performance using earn value management. Tracked earned value and actual cost
with planned value. Performance
of quantity surveys and take-offs. Request
for Information (RFI) preparation and management Request
for Proposal (RFP) management. Cost
per unit calculations based on productivity rates, cost per man-hour and crew
composition. Management
of buyout/purchasing, prepared bids and attended public bid sessions Managed
applications for payments, lien releases and updated schedule of values. Performance
of materials and labor pricing research. Compiled
and maintained a Master Correspondence log, shop drawing submittal logs and
insurance verification log.
Risk
management I
prepared risk management plan, identified risks, performed qualitative and
quantitative risk analysis.
Prepared
risk probability and impact matrix. Revised
stakeholders’ tolerances. Identified
risks using different techniques.
Miami science Museum/ Miami Art Museum, Miami, FL. 2011-2012 I
am assigned as a construction project manager and project control engineer
for the $224M construction budget Miami Science Museum and Miami Art Museum
project located at the heart of City of Miami. I prepared the master schedule
using P6 by defining and sequencing activities, estimating activity resources
and activity durations. I control schedule by comparing between new updates
and the baseline. I
used P6, v7 software in this project.
South Miami Heights High Pump Station, Miami, FL. 2010-2012 I was assigned to Miami-Dade Water and
Sewer Department’s (M-DWASD) South Miami Heights Water Treatment Plant. My
primary responsibility consisted of the following: Reviewing and accepting Critical Path
Method (CPM) project schedules submitted by the Contractor,
which include the baseline schedule and the
subsequent schedule updates. Preparing technical reports which make full
assessment of the schedule submittals and integrate CPM analysis and Earned
Value techniques to assure contractual parameters are met and measure cost
progress. Reviewing Schedule of Values (SOV) prepared by Contractor. Making
recommendations to project management. I analyzed all technical aspects of
construction schedules and prepared schedules planning, design and
construction; monitored schedules and took appropriate actions to ensure that
project is completed on schedule and within approved cost limitations;
provided ongoing interface with contractors, construction managers,
construction site personnel and senior management on project issues;
participated in the development and issuance of project procedures and
policies; resolved issues and problems raised in field reports made by design
and construction management staff; worked with the architect/engineer of
record regarding change orders, time extension, performed interpretation of
contract documents, shop drawing submittals/approvals and other technical
matters as required to ensure a structurally sound, code compliant and
aesthetic facility. I issued field memoranda and directives to contractors to
enforce contract compliance. I used sound, independent judgment to make
on-site change order decisions. I negotiated with contractors and
committed resources on such change orders; review contractors' claims or
disputed work and advise senior management officials. I used P6 software in
this project. Miami
International Airport, North Terminal Program – Construction Scheduling
Contract – Scheduling Support Services. 2008-2009 I
was assigned as project scheduler to the program and was responsible for
construction scheduling for projects 740A, 779D and 779G. My duties included
preparing the baseline schedule; analyzing, updating the construction
schedule; requesting weekly reports of the status of construction generated
by the trades; and assessing time adherence to contract documents. I also
performed risk management and prepared impact schedules as required as the
project progresses. I used P6 software in this project. Construction
Scheduling Consultant Contract – Scheduling Support Services for State School
“SS1”; Miami Dade County Public Schools (MDCPS) 2008-2009 I
assisted with this project’s baseline schedule by analyzing, updating and
commenting on the construction schedule using Primavera P6; requesting weekly
reports of the status of construction generated; and assessing time adherence
to contract documents. Construction
Scheduling Consultant Contract – Miami International Airport (MIA), FL. 2010 As
a Lead Project Controls Engineer, I was responsible for monitoring
construction schedules, budgets, and review of claims for the Southern
Terminal Program (STP) at Miami International Airport (MIA). The STP
Program is an $800 million program at MIA. I coordinated / supervised one
Scheduler and one Cost Engineer. I was the lead in the preparation of
budgets, cash flows, and tracking of actual expenditures on the program. I
was also responsible for the creation and maintenance of the Airport’s Master
Schedule using Primavera P5 and other special assignments. Program
Scheduler for the South Terminal Program at Miami International Airport
(MIA); Dade Aviation Consultants . 2009 As
Lead Project Controls Engineer, I was responsible for monitoring construction
schedules, budgets, and review of contractor claims for projects for the
South Terminal Program at Miami International Airport. The South
Terminal Program is an $800 million dollar program at Miami International
Airport. I coordinated and supervised one Project Scheduler and one Cost
Engineer. I was the lead in the preparation of budgets, cash flows, and
tracking of actual expenditures on the program. I was also responsible for
the creation and maintenance of the Airport’s Master Schedule using Primavera
P5 and other special assignments. Project
Engineer for Miami International Airport (MIA), Ft. Lauderdale, Florida. 2009 I
provided scheduling using MS-Project, estimating and claims support for the
Aviation Department Facilities Division as well as Miami-Dade County
Attorney’s Office. DEF
Wrap Expansion Program, MDAD. 2008 I
was the Lead Project Controls Engineer for this project. I was in
charge of monitoring construction schedules, budgets, and review of
contractor claims, attended project meetings and field inspection of progress
as well as attended negotiations concerning schedule impacts. Miami
Gardens Gas main installation, Florida Gas. 2008 I
was the Lead construction inspection engineer and project scheduler for this
project. I defined activities using rolling wave planning, sequenced
activities, estimated activity resources, loaded cost. I created resource
calendar. I processed changed orders, revised baseline schedule by crashing
and fast tracking. Prepared
review report, analyzed earned values.. City
of Port St. Lucie: Floresta Drive Widening, Southbend Blvd to Thornhill Blvd,
St. Lucie County, Florida. 2008-2009 I was a construction project scheduler for
the reconstruction of about over two miles highway construction project. I
created master schedule using MS-Project, identified and assisted in analysis
of project schedule variances, collected and updated data and updated and
produced scheduling reports, assisted in the development and maintenance of
WBS and helped insure that project coding is effectively used for all
cornerstone applications. I used drawings and specifications for schedule
development, developed CPM schedule logic using the cornerstone scheduling
system and developed logic for elements of the engineering, procurement and
construction process. I implemented construction contracting and the
scheduling implications of contract terms. I tracked the subcontractor
performance. I performed scope control and change management and associated
implications to project scheduling. I used earned value methodology. I was
responsible for gathering and assembling data for schedule updating. I
measured progress and reviewed schedule performance, supported monthly report
preparation. I assisted with creating and maintaining the baseline schedule.
I supported cost analysis function through cross training. I participated in
planning and scheduling meetings to gain insight to planning and scheduling
issues. I gathered data for procedure development. Grove
Commons, Zephyrhills, Pasco County, FL. 2005-2007 The
project was a 347 acres residential development. I
developed detailed schedules using MS-Project with all activities associated
with assigned projects, produced a coordinated, consistent Critical Path
Schedule for entire project, updated periodically, and highlighted any
potential problem and optimization areas, implement and updated progress
reporting and forecasting system for assigned projects, assisted project
manager in presentations/reports and in developing workarounds for project
schedule problems. As
a project scheduler for reconstruction of six miles Florida’s Turnpike with
one interchange and a Toll plaza in the Broward County for Florida’s Turnpike
authority using Primavera P6. This project also includes improving the
existing Toll Plaza. I initiated the program schedule to monitor and track
the progress of the different tasks. 2005-2007 Boynton
Village Town Center Mixed Use Project, Palm Beach County, FL .
2005-2007 I
performed planning, scheduling, and cost estimating tasks. Performed
analyses of preparing reports to assist in ensuring that programs meet or
exceed schedule Commitments
using MS-Project, Participated in the preparation of schedules for all
contract work and performed analyses such as critical path, schedule risk,
and variance analysis, Incorporated contractual and programmatic changes into
the IMS in order to maintain realistic, current contract schedule baselines. SKILL
/ COMPETENCIES:
Project
Control:
Primavera Project Planner (P6/ P5/ P3) & MS Project.
Database:
MS-Access, MS SQL Server,
Oracle P6
works with Oracle database now.
Programming:
C/C++, Visual Basic, Java, FORTRAN, UNIX
Packages:
Microsoft FrontPage,
MS-Office
Scripting:
VB Script, J Script
Graphic:
GIS (Arc Info & Arc
View), Photoshop. Relocation / Travel: Ready to Relocate
and Travel as required. References: Available upon request. Overall
comment: Try
to put more and more Primavera P6. Anywhere you talked about scheduling put
scheduled with Primavera P6. In my resume I didn’t put in the beginning then
one employer called me and asked me what software you used to schedule. I
said Primavera, he said put that Primavera in the resume. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Fluent |
|
|
|